Our company provides protective film, conductive foam, acetate tape, insulation sheet, and buffer foam for Shenzhen Skyworth Automotive Intelligence Co., Ltd.
The production process is lengthy: Traditional molds require 10 processes (stamping-welding-grinding-testing, etc.), and are highly dependent on manual labor.
Limited production capacity: The maximum daily output is only 5,000 pieces, with a yield of 85%, which is difficult to match the customer's annual order demand of 30%.
Cost pressure: 6 operators are required per shift, and labor costs account for 25% of the total cost.
Tiandexin Technology and Skyworth Automotive jointly established a special team to complete the following technical upgrades:
Integrated mold design: The composite stamping process is used to compress 10 processes to 4 (integrated stamping-molding-finishing-self-inspection).
It solves the customer's demand for quality and production capacity, and is recognized by customers. We have been cooperating since 2005.